6.6 TURBOCHARGER SERIES 60 NATURAL GAS (AUTOMOTIVE) ENGINE 6.6.8 Installation of Turbocharger Series 60G Automotive Engine To install the turbocharger: 1. Attach a chain hoist and a suitable lifting sling to the turbocharger assembly. 2. Remove any covers that were placed over the openings of the air inlet and exhaust outlet openings on the engine and turbocharger when the turbocharger was removed. 3. Remove any covers on the oil inlet and drain lines, and the oil inlet and drain openings on the turbocharger. 4. Place the turbocharger assembly into position on the exhaust manifold. Use a new gasket between the exhaust manifold and the turbine housing flange. 5.
Secure the turbocharger to the exhaust flange. Tighten the nuts just enough to hold the turbocharger in place. 6. Slide the charge air cooler air inlet tube hose over the compressor housing outlet opening and secure it in place with the hose clamps. PERSONAL INJURY To avoid injury from the sudden release of a high-pressure hose connection, wear a face shield or goggles. NOTICE: Do not use any type of lubricant on the inside of any air inlet hose or on the hose contact surfaces of the turbocharger compressor housing, CAC ducting or the intake manifold. 7. Torque the turbocharger to exhaust manifold locknuts to 58-73 N·m (43-54 lb·ft). 8.
Install the oil drain line, using a new gasket, between the opening in the bottom side of the turbocharger center housing and the drain hose that runs to the cylinder block. Torque the bolts to 30-38 N·m (22-28 lb·ft). 9. Refer to section 12.1.3 for verification of proper turbocharger installation. 10. Install water supply and return lines. (Rev. 2005) All information subject to change without notice. 6-60 6SE483 0507 Copyright © 2005 DETROIT DIESEL CORPORATION