Detroit Diesel — Print Preview - C:\DOCUME~1\llakso01\LOCALS~1\Temp\.aptcache\S600507006\S600507

SERIES 60 SERVICE MANUAL 10.1.2.1 Inspection of Front Mounted Power Take-off Visually inspect the PTO hub contact surfaces for galling or burrs. To correct surfaces that have damage, smooth these surfaces with emery cloth or a stone. 10.1.3 Installation of Front Mounted Power Take-off Perform the following steps to install the PTO assembly: 1. If removed, install tool J–36375–A to the inspection plug hole in the bottom of the flywheel housing; see Figure 10-2. 2. Install the PTO/crankshaft pulley; refer to section 1.15.3. 3. Install the PTO hub assembly inside of the PTO/crankshaft pulley ensuring the slot on the backside of the hub fits over the dowel in the pulley. 4.

Install the PTO hub assembly attaching bolt and retainer after coating the bolts threads and underside of the bolt head with International Compound #2® or equivalent. Torque the bolt to 610 N·m (450 lb·ft). All information subject to change without notice. (Rev. 2005) 6SE483 0507 Copyright © 2005 DETROIT DIESEL CORPORATION 10-7