Komatsu — EVERY 250 HOURS SERVICE

. MAINTENANCE SERVICE PROCEDURE adjust. 3. After adjusting, tighten locknut (3) of adjustment bolt (2) and bolt (1). NOTICE CHECK FOR LOOSE WHEEL HUB BOLTS, TIGHTEN wear will be increased and always turn the nuts in the (80 to 100 kgm, 578.6 to 723.3 lbft) stud bolt is broken, replace all the stud bolts for that 4 - 50 ADJUSTING 1. Open th e engine side cover on the right side of the machine. When a the lock Check eac h pulley for da mage, wear of th e V-groove, an d wear of th e V-belt. I n particular, be sure to check that the V-belt is not touching t he bottom of th e V-groove.

In case an y of the followi ng occurs, ask the Komatsu d istributor in your territory to replace the be • The fan belt has elong ated, leaving litt le allowance fo r adjustme • A cut or crack is found on the belt. • Slippin g or creaking so und is heard co ming from the When the new V-belt is s et, readjust it aft er one hour of operation. I f wheel hu b bolts (1) ar accidents m ay be cause 1. Check f or loose nuts, and tighten if When c hecking for l oose nuts, al to check. directio n of tightening Tightening torque: 78 2. wheel.