24. SERVICE PROCEDURE ADJUSTING IN VERTICAL DIRECTION If the total (B + C) of clearance B (clearance between support @ and guide plate 0) and clearance C (clearance between top and bottom guide @ and wear plate @ of track frame) is more than 5 mm (0.20 in), remove the necessary amount of shim @ as follows, and add to shim @ to adjust clearance B + C to 2 mm (0.08 in). When the condition is normal, C = 0 mm (0 in). 1. To calculate the amount of adjustment, measure clearance B, then subtract 2 mm (0.08 in) from that value to obtain the adjustment amount. Example: Clearance B = 5 mm (0.20 in) Adjustment amount = 5 - 2 = 3 mm (0.12 in) AE210210 2. Loosen bolts @ (inside, outside:
x 4) until there is no response to the spring. 3. Loosen bolt 0. When doing this, do not loosen it more than 3 turns. 4. Using a bar, pull up top and bottom guides 0, set clearance C to 0, then remove the amount of shims measured in Step 1. 5. Add removed shims 0 on top of shim 8. (left, right, inside, and outside: total 8 places) When doing this, check that the total shim thickness for shim @ and shim @ is the same before adjustment and after adjustment at all places. If any shims are discarded or added, the built-in spring will not function properly. There are two thicknesses of shim: 2 mm (0.08 in), 1 mm (0.04 in) 6. Tighten spring holder bolt @. 7.
Tighten bolt @ to the specified tightening torque. Tightening torque: 549 f 59 Nm (56 + 6 kgm, 405 2 43 Ibft) The possible amount of adjustment at this part is a maximum of 6 mm (0.24 in). 3-33