John Deere 2120 Tractor — tm4252

Model 2120 Tractor TM-4252 (Dec-70) Engine 20 Timing Gear Train 25-3 Prior to installing new oil seal, coat outer surface of seal with an oil-resistant sealing compound. Press in oil seal until it bottoms in bore. The spring-loaded lip of the seal should face the timing gears. Use special tools No. 815 and JD 250. 3. Install oil pump and oil pump gear (see group 30). NOTE: Tighten hex. nut of pump shaft only after timing gears have been adjusted and lower idler gear has been installed so that the gear pair can be blocked by means of a clean rag. CAUTION: When installing oil seal, support timing cover to prevent distortion. 4. Install fuel injection pump with gear (see section 30).

INSTALLATION NOTE: If engine has been completely disassemb¬ led, install crankshaft before installing cylinder block front plate. 5. With the crankshaft set at TDC as indicated in item 2, align mark "b" stamped onto camshaft gear (see fig. 3) with line drawn through center of crankshaft and camshaft as shown in fig. 3, using timing tool No. JD 254 and rotating the camshaft. Coat front plate seal facing cylinder block with a film of "PERMATEX Type 3", "TEROSON Atmosit", "COLLEX Aviation" or "HERMETIC HERMALEX". CAUTION: Cut off protruding edge of gasket only when timing cover has been tightened. Tighten front plate attaching screws to the specified torque (see Torques for Hardware).

INSTALLATION AND ADJUSTMENT OF TIMING GEAR TRAIN Align timing marks of camshaft, balancer shaft and injection pump gears with center of crankshaft after having installed them. Install and adjust timing gears as follows: 1. Install camshaft and balancer shafts (see group 10). 2. Rotate crankshaft clockwise (seen from radia¬ tor) until piston No. 1 (radiator side) is imme¬ diately before TDC of its compression stroke. Insert timing screw in bore of flywheel housing and flywheel when the latter is exactly in its TDC position. Fig. 3 - Timing Camshaft Gear by means of Timing Tool No. JD 254 b Timing mark 6. With the crankshaft set in TDC position as in¬ dicated in item 2, align mark "c" (fig.

4) stamped onto injection pump gear with line drawn through center of crankshaft and pump shaft as shown in fig. 4, using timing tool No. JD 254 and rotating the injection pump shaft. CAUTION: Use timing mark indicating number of cylinders on respective engine. NOTE: With the engine disassembled, rotate crankshaft so that piston No. 1 bearing journal is in its top position facing the cylinder head. In this position the keyway of the crankshaft gear faces exactly upward (cylinder head side). CAUTION: Do not rotate crankshaft after having adjusted TDC. Printed in Germany