hyundai R510LC-7 — 1. OPERATIONAL PERFORMANCE TEST

4) TRACK REVOLUTION SPEED (1) Measure the track revolution cycle time with the track raised off ground. (2) Preparation Adjust the tension of both side tracks to be equal. On the track to be measured, mark one shoe with chalk. Swing the upperstructure 90 90~110 and lower the bucket to raise the track off ground. Keep the boom-arm angle between 90 to 110 Mark as shown. Place blocks under machine frame. Keep the hydraulic oil temperature at 50 5 C. 21077MS06 (3) Measurement Select the following switch positions. Travel mode switch : 1 or 2 speed Mode selector : H mode Auto decel switch : OFF Operate the travel control lever of the raised track in full forward and reverse.

Rotate 1 turn, then measure time taken for next 3 revolutions. Raise the other side of machine and repeat the procedure. Repeat steps three times and calculate the average values. and (4) Evaluation The revolution cycle time of each track should meet the following specifications. Unit : Seconds / 3 revolutions 7-6 Model Travel speed Standard Maximum allowable R510LC-7 1 Speed 28 2.0 48 2 Speed 23.3 2.0 29.2