hyundai R510LC-7 — 2. MAIN CONTROL VALVE

(2) Arm in (flow summation) When the arm 1 spool is pushed to the left by the pilot pressure of port Pa5, the oil discharged from pump P1 flow into the port A5 via neutral passage(L1), the load check valve(S5-1) and passage(S5-2). When the arm 2 spool is pushed to the left by the pilot pressure of port Pa9, the oil discharged from pump P2 flows together into the port A5 via neutral passage(R1), the load check valve(S9-1) and passage(S9-2).

At the same time, as the port pc1 is pressurizing and the spool(AD3) of anti-drift valve is pushed down, the pressure of spring chamber(AD5) is released and the poppet(AD1) is opened and then the oil returned from port B5 flows into the tank passage(Ta) through the passage(S5-4) inside arm 1 spool to open and is connected to the passage(S5-2) and flows together into the port A5, the cylinder speed is raised and also is prevents the cavitation of bottom side. 45071MC11 2-35 45