12) Loosely tighten the bolts and nuts at the designated places from the top of the engine assembly. Tighten the bolts and nuts to the specified torque in the numbered sequence in two or three steps. 12 x 83 8 x 55 TORQUE: 12 x 83 mm flange bolt: 64 N . m (6.5 kgf . m, 47 lbf . ft) 10 x 70 mm flange bolt: 44 N . m (4.5 kgf . m, 33 lbf . ft) 8 x 55 mm flange bolt: 26 N . m (2.7 kgf . m, 20 lbf . ft) 10 mm cap nut: 44 N . m (4.5 kgf . m, 33 lbf . ft) ① ⑤ ⑥ 13) Connect the water relief tube C to the relief valve cover (P. 8-7). [1] 10 mm CAP NUTS 10 x 70 ② ③ ④ 14) Connect the air vent tube A and the oil tube to the mounting case.
[1] AIR VENT TUBE A [2] OIL TUBE 15) Tape around the stepped part of the shift shaft B to protect it. 16) Install the seal holder assembly on the engine assembly and tighten the two 6 x 20 mm flange bolts (P. 17-23). Set the starter cable and the alternator fuse cable in the cable bracket A (P. 17-23). 17) Install the following parts. – Shift link bracket/neutral switch (P. 17-17) – Starter cable (P. 18-17) – Starter motor (P. 18-14) – Oil case (P. 14-95) – Extension case/lower rubber mount (P. 14-91) – Gear case assembly (P. 14-5 and 44) – Vapor separator (P. 5-125) – Under cover front bracket/L./R. side cover brackets (P. 4- 30) – L./R. engine under covers (P. 4-14) – Engine cover (P.
4-2) [1] SEAL HOLDER ASSEMBLY 6 x 20 (2) [2] TAPE [3] SHIFT SHAFT B 7-8