12) Install the new chain case O-ring on the chain case. [1] CHAIN CASE O-RING [2] CHAIN CASE 13) Remove the old liquid gasket, oil and the contamination from the cylinder block/cylinder head and chain case mating surfaces. [1] Apply bar [2.5 mm (0.10 in) thick] of the liquid gasket here again; i.e. to the bead of the liquid gasket applied before. 14) Apply a bead [ш2.0 – 3.0 mm (ш0.08 – 0.12 in)] of the liquid gasket (ThreeBond ® #1280B or equivalent) to the indicated areas of the chain case. Apply bead [2.5 mm (0.10 in) thick] of the liquid gasket again to the part “A” shown in the drawing; i.e. apply to the bead of the liquid gasket applied before.
NOTICE [2] PART “A” Assemble the chain case within 5 minutes after applying the liquid gasket. If it has been left for 5 minutes or longer, remove the old liquid gasket and apply the liquid gasket again before assembly. [2] PART “A” [3] Apply a bead of liquid gasket. [3] Apply a bead of liquid gasket 9-15