7) Apply grease to the vertical shaft spline and the shift rod spline. Apply grease to the water tube insertion part and to the inner wall of the water tube seal ring of the impeller housing. Apply grease to the inner wall of the vertical shaft bushing [XCC and XCD types only] (P. 14-90). [2] VERTICAL SHAFT [1] WATER TUBE [3] WATER TUBE SEAL RING 8) Install the two dowel pins. Aligning the water tube with the water tube seal ring of the impeller housing, install the vertical shaft and the crankshaft. Install the shift rod and shift rod A, too, by aligning the splines. [4] 6 x 10 mm DOWEL PIN (2) 9) Install the gear case assembly on the outboard motor.
Loosely tighten the seven 10 mm washers and the seven 10 x 40 mm hex. bolts. [7] 10 mm WASHER (7) [6] 10 x 40 mm HEX. BOLT (7) [5] GEAR CASE ASSEMBLY 10) Connect the speed sensor tube B and the speed sensor tube C. [1] SPEED SENSOR TUBE B 11) Lower the outboard motor to the lowermost position and tighten the seven 10 x 40 mm hex. bolts to the specified torque. TORQUE: 34 N . m (3.5 kgf . m, 25 lbf . ft) [2] SPEED SENSOR TUBE C 12) Position the gear case cover on the gear case assembly. [1] GEAR CASE COVER [2] “ ” MARKS 13) Install the gear case cover aligning the “ ” mark on the gear case cover with the “ ” mark on the gear case. Tighten the 10 mm washer and the 10 x 32 mm hex. bolt.
14) After installing the gear case assembly, adjust the shift control cable (P. 3-25). [3] 10 x 32 mm HEX. BOLT [4] 10 mm WASHER 14-45