JCB — Repair Procedure

www.WorkshopManuals.co.uk Wiring Harness - Repair Procedure (cont'd) With the Butane Heater assembly 892/00350, seal the connection using the following procedure. a Remove the cap A from the end of the disposable gas cartridge B . A B S189490/1 b Before assembling the gas cartridge to the reflector element C , turn the red ring D to the left, (in the direction of the minus sign marked on the ring). C D S189490/2 c Position the tube hanging down from inside the reflector assembly into the hole at the top of the gas cartridge. Then press the gas cartridge up into the reflector assembly as far as possible until the two elements are clasped firmly together. A click will be heard.