www.WorkshopManuals.co.uk 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section E Hydraulics Section E Service Procedures 24 - 2 24 - 2 B Test Cylinder/Piston Leakage 1 Ensure that the oil temperature is at 50°C (122°F) by using the hydraulic oil temperature probe detailed in A1. 2 Take the weight off the ram to be tested, in this example, by positioning the backhoe with dipper vertical and bucket on the ground. 3 Use a suitable pressure gauge A to blank off the supporting port of the ram. 4 Disconnect the hose from the opposite port D and leave the port open to atmosphere.
5 Apply a load to the suspect ram for example the boom ram by raising the dipper to the horizontal as at B. 6 After the initial movement measure the pin to pin movement as at C and note the rod movement over 10 minutes. 7 If rod movement is evident the ram is defective. C Test Spool Leakage Note: The following procedure applies only to services fitted with A.R.V.'s. Note A.R.V.'s are not fitted to loader lift, loader auxiliary, stabilisers or to the bucket rod side service except when a Rockbreaker is fitted. 1 Render the A.R.V.'s inoperative in the suspect service. This is achieved by removing the A.R.V. and replacing with a blanking plug (part no. 25/609901) and seal kit (25/610301).
2 Re-check the piston rod movement as described steps A1 to A6. A.R.V. Control Layout JCB ISO Slew - Right B1 B1 - Left A1 A1 Boom - Rod B2 B5 - Head A2 A5 Dipper - Rod A5 A2 - Head B5 B2 Bucket - Rod A6 A6 - Head B6 B6 Note: Bucket ram rod side ARV only fitted to machines equipped with Rockbreakers. 3 If the rod movement is now acceptable the A.R.V. must be at fault. The A.R.V. may only require cleaning and then resealing. If dirt is evident, the hydraulic tank should be drained and cleaned. It is recommended that when re-filling the hydraulic tank that new oil and filter be used to prevent further contamination. If the A.R.V. is worn it should be replaced. A D C B C FIG 2 338800220001