JCB — Dismantling and Assembly

www.WorkshopManuals.co.uk Purchased from www.WorkshopManuals.co.uk Section E Hydraulics Section E 35 - 2 35 - 2 Main Pump Variable Flow Dismantling and Assembly Before removing and dismantling the pump, make sure it is the pump that is at fault. Complete all the necessary checks as detailed in Service Procedures, Variable Flow Pumps. Make sure that the exterior of the pump and working area is thoroughly cleaned and free of possible sources of contamination. Following removal of the pump from the machine, transfer it to a clean dirt free environment ready for dismantling. The variable displacement pump has matched-ground components.

For this reason, some items will only be available as a sub-assembly, for instance the barrel and piston assembly. All the ‘O’ rings, seals and bearings are available in a kit form from your JCB Distributor. Dismantling Refer also to Service Procedures, Variable Flow Pumps - Renewing Drive Shaft Seal. 1 Remove capscrews 1 (4 off) and detach the regulator assembly 2 from the pump housing. 2 Mark the position of the port plate 3 to pump housing 4. 3 Remove socket screws 5, and remove the port plate together with the valve plate 6, control piston 7 and stroking piston 8. Hold the plate in position during removal. 4 Remove taper roller bearing 9 and shim 10 from the drive shaft 11.

5 Remove the rotary piston assembly 12 from the pump housing. Assembly includes shaft 11, bearing 15, and cradle 16. 6 Remove and discard port plate to pump housing ‘O’ ring 13. 7 Remove bearing shells 14 and disc 17. 8 Remove the outer bearing races (not shown) from the pump housing and the port plate. Only remove the races if they are damaged and unserviceable. 9 Lift the valve plate 6 off the port plate, do not lose the dowel pins (not shown). 10 Remove and discard ‘O’ rings 18. 11 Remove control piston 7. Note that the control piston is mounted on the same side as the regulator valve. 12 Remove the stroking piston assembly 8.

Further dismantling and assembly of the pump is not recommended. Inspecting Parts Generally check all pump parts for damage and/or wear. Any parts that are scored or damaged must be replaced with new ones. The shaft ‘O’ ring grooves and all sealing faces must be free of burrs and scores. During assembly, make sure that the rotary piston group move freely. Renew all ‘O’ rings and seals. Assembly Assembly is generally a reversal of the dismantle procedure, but note the following: The taper roller bearing must have a preload of 0.0 to 0.05mm (0.0 to 0.002in.). If the original bearing and shim is being fitted no preload adjustment is required.

If a new bearing is installed a preload adjustment is required: Preload Adjustment: Install a setting shim of known thickness (as shown at A). The shim thickness must be manufactured to a tolerance of ± 0.01mm (0.0004in.). In this example the shim thickness is 1.5mm. Fit the port plate item 3 and finger tighten the socket screws. It is important that the socket screws are tightened evenly and the port plate sits square. Using feeler gauges measure the gap B between the port plate and the pump housing 4. Measure in more than one position to establish the port plate is fitted evenly. Obtain shim thickness (dimensions in mm):

Example measured gap 1.26 Subtract preload - 0.05 Total 1.21 Known shim thickness 1.50 Subtract calculated preload -1.21 SHIM THICKNESS 0.29 When the shim thickness has been calculated, remove the setting shim A and fit the required shim (in this instance the shim would be 0.29mm). Note: Setting shim A is not currently available as a service tool. The shim (and the calculated shim) can be manufactured locally. Maintain a tolerance of ± 0.01mm (0.0004in.). The lubrication bore relief (item C) on the cradle must be fitted on the pressure side of the pump. Check the control piston and the stroking piston move smoothly. The regulator valve assembly is currently a non serviceable part.

Inspecting Parts Generally check all pump parts for damage and/or wear. Any parts that are scored or damaged must be replaced with new ones. The shaft ‘O’ ring grooves and all sealing faces must be free of burrs and scores. During assembly, make sure that the rotary piston group move freely. Renew all ‘O’ rings and seals. Assembly Assembly is generally a reversal of the dismantle procedure, but note the following: The taper roller bearing must have a preload of 0.0 to 0.05mm (0.0 to 0.002in.). If the original bearing and shim is being fitted no preload adjustment is required. If a new bearing is installed a preload adjustment is required: Preload Adjustment:

Install a setting shim of known thickness (as shown at A). The shim thickness must be manufactured to a tolerance of ± 0.01mm (0.0004in.). In this example the shim thickness is 1.5mm. Fit the port plate item 3 and finger tighten the socket screws. It is important that the socket screws are tightened evenly and the port plate sits square. Using feeler gauges measure the gap B between the port plate and the pump housing 4. Measure in more than one position to establish the port plate is fitted evenly. Obtain shim thickness (dimensions in mm):

Example measured gap 1.26 Subtract preload - 0.05 Total 1.21 Known shim thickness 1.50 Subtract calculated preload -1.21 SHIM THICKNESS 0.29 When the shim thickness has been calculated, remove the setting shim A and fit the required shim (in this instance the shim would be 0.29mm). Note: Setting shim A is not currently available as a service tool. The shim (and the calculated shim) can be manufactured locally. Maintain a tolerance of ± 0.01mm (0.0004in.). The lubrication bore relief (item C) on the cradle must be fitted on the pressure side of the pump. Check the control piston and the stroking piston move smoothly. The regulator valve assembly is currently a non serviceable part. 9803/3280