www.WorkshopManuals.co.uk Section E Hydraulics Section E 87 - 2 Hydraulic Rams 87 - 2 Dismantling and Assembly - Slew Ram Assembly Clean threads of piston rod, piston head, end cap and cylinder using a wire brush. Use JCB Cleaner/Degreaser to ensure that all threads are free from grease, hydraulic oil and sealant. Allow 15 minutes for solvent to dry before applying JCB Threadlocker and Sealer (High Strength). Dismantling The numerical sequence shown on the illustration is intended as a guide to dismantling. For assembly the sequence should be reversed. Ensure that lubricants used during assembly do not come into contact with the JCB Threadlocker and Sealer (High Strength).
Place ram assembly on a locally manufactured strip/rebuild bench as shown, or alternatively, hold the ram in a suitable vice taking care not to damage machined faces. Refer to JCB Ram Sealing Procedure for the correct method of fitting seals to the end cap and piston head. Remove cylinder 6 using special spanner (see Service Tools ). Tap the cylinder off the piston head assembly using a suitable drift (e.g. nylon). Apply JCB Activator to threads of end cap and cylinder. Allow Activator to dry for 15 minutes before bringing into contact with the JCB Threadlocker and Sealer (High Strength).
Position the piston rod assembly in a vice, use soft jaws and stand the assembly vertical whilst clamping on the eye end. Note: Neither the JCB Threadlocker and Sealer (High Strength) nor Activator must be allowed to contact seals, bearing rings, or 'O' rings. Fit locking dowel 10 to piston head/rod as follows: 1 Fit 'O' ring 12 into piston head 11 . 2 Fit piston head to piston rod and torque tighten to 405 Nm (300 lbf ft). 3 New ram Shaft and piston head fitted. - If both are required, the following procedure should be followed: a Drill through piston head into piston rod.
Use an undersized diameter drill first as a guide and then drill with the correct size diameter drill to suit; refer to the table for drill diameters and depths. S266380 b Remove all swarf and contamination. Insert dowel 10 into drilled hole, make sure tapped extractor hole is to outside. Remove seal 8 and wear rings 7 and 9 from piston head. Extract dowel 10 from the piston head using a metric screw threaded into the extractor hole. 4 New piston head fitted on a pre-drilled piston rod. - Re-drill and dowel BOTH the piston head and piston rod at 90° from the existing drilled dowel hole in the piston rod. Follow the procedures described in step 3.
Remove piston head from rod using special spanner (see Service Tools ). Remove ‘O’ ring 12 . 5 New piston rod fitted to a pre-drilled piston head. - Use the pre-drilled hole in the piston head. Care must be taken not to elongate the existing hole in the piston head. Lift the end cap assembly 13 off the piston rod. Remove ‘O’ ring 14 , rod wiper seal 15 and rod seal 16 from the end cap assembly. Check the end cap bearing 13A for damage, scores or nicks. a Use a drill the same diameter as the pre-drilled hole in the piston head to make a 'centre mark' in the piston rod. DO NOT drill the piston rod at this stage.
Item 18 is the metering orifice plate and item 17 its retaining wire, do not remove these items unless problems with the metering are suspected. Ensure that metal components are free from scoring, nicks and burrs. A damaged rod will impair the life of the seals. ...........continued Check the bore of the ram cylinder for damage. 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1