www.WorkshopManuals.co.uk Section E Hydraulics Section E 87 - 3 Hydraulic Rams 87 - 3 Dismantling and Assembly - Slew Ram Assembling (continued) DRILLING DETAILS FOR PISTON HEAD RETENTION b Use an undersized diameter drill as a guide and drill into the piston rod to the required depth (see table), make sure the drill has centred correctly on the 'centre mark' made at step 5a. X c Use the correct size diameter drill to suit the dowel and drill to the required depth (see table). d Remove all swarf and contamination, insert the dowel. Y Install cylinder onto the rod assembly, make sure that the cylinder is fitted square to the rod assembly. Firmly push the cylinder over the piston head seals.
Apply JCB Threadlocker and Sealer (High Strength) to first three threads of cylinder, torque tighten the cylinder to 678 Nm (500 lbf ft). A263750 (all dimensions in mm) Note: If hydraulic oil contacts the uncured JCB Threadlocker and Sealer (High Strength) a weakening of the bond will result. Cure times vary according to the ambient temperature. Allow a minimum of 2 hours between assembly and filling the ram with oil. Ram Dowel Guide Guide Dowel Dowel Size Size Drill Ш Drill Drill Ш X Drill Depth Depth Y 80 x 50 6Ш x 20 4 21 6.02/6.10 22/23 70 x 40 Note: Cold weather operation.
When operating in conditions which are consistently below freezing, it is recommended that the rams are operated slowly to their full extent before commencing normal working. 90 x 50 8Ш x 25 5 24 8.02/8.10 27/28 100 x 60 110 x 60 12Ш x 30 8 28 12.02/12.10 32/33 110 x 65 Position pipe assembly in correct position and torque tighten probe assembly 2 to 75Nm (55 lbf ft; 7.6 kgf m). DO NOT over-tighten the probe. 120 x 65 12Ш x 35 8 33 12.02/12.10 37/38 130 x 75 Make sure seals 19 and 21 are fitted the correct way as shown. Torque Settings Item Nm kgf m lbf ft 11 405 41.3 300 6 678 69.2 500 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1