www.WorkshopManuals.co.uk Dismantling (cont'd) Position transmission vertically, standing on the face of the torque converter housing. 10a 9 Unscrew capscrews and remove solenoid control valve. 10 Note ‘O’ rings fitted around ports on mating face of solenoid valve body. Note: See Service Procedures , Forward/Reverse Control Valve for solenoid dismantle/assembly . 11 10 On 4 wheel drive transmissions remove the 4 wheel drive hydraulic pipe and control valve 10a . 11 Undo the 4 bolts and remove the gear lever turret. Remove the baffle plate beneath if fitted. If necessary the turret assembly can be dismantled as follows: 9 a Slacken worm drive clips and remove rubber boot.
b Using a suitable press or clamp, carefully press the top lever 11a down to compress spring 11b , just enough to release pressure on circlip 11c . Note: BEWARE of spring pressure acting on nylon seat when circlip is removed. c Remove circlip 11c . A387950 11c 11d 11a 11e 11b d Slowly release the pressure from the top lever 11a and remove it, together with bush 11d , washer 11e and spring 11b . e Rotate spring 11c so as to disengage from the retaining tabs inside the turret 11 . Be aware that the spring may suddenly disengage while still under pressure. Repeat this operation until all the coils are disengaged and the spring can be removed. 11 f Remove retainer 11f and bottom lever 11g .
A388210 11c 11f 11g 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section F Transmission Section F 110 - 3 Synchro Shuttle Gearbox 110 - 3