JCB — Dismantling

www.WorkshopManuals.co.uk Dismantling (cont'd) 12 Unscrew plug and withdraw pressure maintenance valve spool and spring. 13 Unscrew four bolts and remove pressure maintenance valve body. Remove and discard gasket. 12 13 A387960 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section F Transmission Section F 110 - 4 110 - 4 Synchro Shuttle Gearbox 14 Remove the torque converter pressure relief valve ball and spring assembly 14a. Remove the torque converter pressure regulating valve spool and spring assembly 14b. 15 Unscrew bolts and lift off output end casing 15a. Be sure to retrieve bearing outer cups from inside the casing. Keep the cups together with their associated bearing.

15a 15 14a 14b A387970