www.WorkshopManuals.co.uk Rams Dismantling and Assembly Assembly The numerical sequence shown on the illustration is intended as a guide to dismantling. 1 Clean the threads of the end caps and cylinder using a wire brush. For assembly the sequence should be reversed. 2 Use JCB Cleaner & Degreaser to ensure that all threads are free from grease, hydraulic oil and sealant. Allow 15 minutes for solvent to dry before applying JCB Threadlocker and Sealer (High Strength). Dismantling 1 Fix the ram assembly on a locally manufactured strip/rebuild bench as shown at A . Ensure that lubricants used during assembly do not come into contact with the JCB Threadlocker and Sealer (High Strength).
2 Remove both end caps, using a special spanner (refer to Service Tools ). Pull the piston rod assembly from the cylinder. 3 Refer to Section E Rams - JCB Ram Sealing Procedure for the correct method of fitting seals to the end cap and piston head. Note 1: DO NOT allow the piston rod to come into contact with the cylinder bore. The cylinder bore may be damaged by careless dismantling. 4 Clamp the cylinder vertically and lower the piston rod assembly in from the top, as shown at B . Take care not to allow the piston rod to come into contact with the cylinder bore. Be sure to engage the piston head new wear rings and seal carefully into the cylinder.
If the piston head wear rings or seal are damaged during this stage, they must be renewed. 3 Position the piston rod assembly on a bench in place of the ram cylinder. Remove the seal and wear rings from the piston head. Note 2: The piston head cannot be removed from the rod. If there is damage to the rod or piston head, replace the complete assembly. 5 Apply JCB Activator to threads of the end caps and cylinder. Allow Activator to dry for 15 minutes before bringing into contact with the JCB Threadlocker and Sealer (High Strength). 4 Carefully inspect the bore of the cylinder and the piston rod outer diameter for scoring, nicks and burrs.
If such damage is visible the components must be renewed. Note 4: Neither the JCB Threadlocker and Sealer (High Strength) nor Activator must be allowed to contact seals, bearing rings or ‘O’ rings. Note 3: If burrs are evident on the ends of the piston rod at positions C or D remove by careful filing. 6 Apply JCB Threadlocker and Sealer (High Strength) to threads of the ends caps, fit new ‘O’ ring 5 . Both end cap assemblies are the same, dismantle as follows: 7 Ensure that there are no burrs at the ends of the piston rod, see Dismantling - Note 3: 5 Remove the ‘O’ ring 5 , end cap seal 6 and wiper seal 7 . 8 Fit an end cap over the piston rod.
Apply light hand pressure to the cap to engage the gland seal on the piston rod. DO NOT use excessive force. Screw on the first end cap and then fix the assembly on the strip/rebuild bench as shown at A . Fit the remaining cap and then torque tighten both caps. 6 The bearing bush 8 can be renewed if necessary. However, time will be saved if a complete end cap and bush assembly is obtained. Note 5: If hydraulic oil contacts the uncured JCB Threadlocker and Sealer (High Strength) a weakening of the bond will result. Cure times vary according to the ambient temperature. Allow a minimum of 2 hours between assembly and filling the ram with oil.
Torque Settings Item Nm kgf m lbf ft 1 678 69.2 500 Note 6: Cold weather operation. When operating in conditions which are consistently below freezing, it is recommended that the track rod is operated slowly to its full extent in both directions before commencing normal working. 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section H Steering Section H 32 - 2 32 - 2 Power Track Rod