www.WorkshopManuals.co.uk Removal and Replacement Dismantling and Assembly The numerical sequence shown on the illustration is intended as a guide to dismantling. ! WARNING Make the machine safe before getting beneath it. Lower the attachments to the ground; engage the parking brake; remove the starter key, disconnect the battery. 2-3-2-2 For assembly the sequence should be reversed. Note 1: The priority valve is not serviceable beyond the removal of foreign matter (Refer to Service Procedures, Priority Valve - Cleaning ). A faulty unit must be replaced. The priority valve is mounted on the right hand side chassis member, adjacent to the loader valve block.
It is attached to the chassis member by one bolt A , and is accessible from underneath the machine. Dismantling Press out the spool item 12 using a nylon pin. Take care not to damage the bores of the valve. When replacing always renew sealing ‘O’ rings 2 , 4 , 6 , and 10 . Assembly Make sure that spring seat of spool 12 faces toward LS connection. Clean all parts in clean paraffin. Lubricate all parts with hydraulic fluid. Renew aluminium washers 8 and 10 . Note 2: All hydraulic adapters that are installed together with a bonded sealing washer must also have JCB Threadseal applied to the threads of the adapter.
9 10 Torque Settings Item Nm lbf ft 7 50 37 9 50 37 11 3 Bleeding 4 To bleed the LS line, start the engine, loosen the connection on the valve, turn and hold the steering wheel fully in either direction. When bubble free oil flows from the joint, tighten the connection. 1 2 6 5 12 A 8 7 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section H Steering Section H 40 - 1 40 - 1 Priority Valve