Doosan G643 LP Engine — Doosan G643 LP Engine User Manual

Removal and Installation of CA100 Mixer for G643 Follow the procedures below for removal and reinstallation of the CA100 mixer in non-certified systems. CA100 Mixer Removal Steps (1) Gasket-Adapter Plate MTG. (2) Adapter-Intake Manifold (3) Fitting (4) TMAP sensor (5) Washer-Tamp MTG (6) Bolt-Tamp MTG (7) Gasket-ITB (8) Bolt-Adapter (9) ITB (10) O-Ring (11) O-Ring Spacer (12) Mixer (13) Fitting (14) Fitting- Vacuum Small (15) Apollo Adapter (16) Bolt (17) Fitting Figure 33. CA100 Mixer in Non-Certified System 1. Close the liquid outlet valve in the forklift cylinder or fuel storage container. 2.

Purge the system of fuel by starting the engine and running until all trapped fuel in the system is exhausted and the engine shuts down. 3. Key switch in “OFF” position. 4. Remove the air cleaner hose (1). 5. Remove the vacuum line (2). 6. Remove vapor fuel inlet line (3) from the mixer (6). 7. Disconnect the wires leading to the electronic throttle body by pinching the lock tabs on either side of the wiring harness connector (8). 8. Loosen the four bolts (4) that secure the mixer/adapter/throttle body assembly to the intake manifold. 9. Remove the mixer (6) and the throttle body (7) as an assembly by gently pulling upwards. Take care not to drop anything down the intake manifold. 10.

Gently wiggle and pull to separate mixer and adapter from the throttle body. Take note of the adapter orientation on the mixer, as it must be reinstalled correctly for proper fit on the throttle. 11. Remove the four mounting screws that attach the throttle adapter to the mixer. 12. Remove the vapor fuel inlet fitting from the mixer. 17 12 12-01 13 15 16 10 11 14 4 9 6 5 8 7 3 2 1 G643(E) Service Manual Chapter 6. LPG FUEL DELIVERY SYSTEM 212