Tests and Adjustments Secondary Stage (Break-Off) Test 1. Connect the vacuum pump, the Magnehelic gauge and the regulator vapor outlet to the Union Tee fitting (Figure 30). Make sure there is no leakage at any of the fittings. 2. Using the vacuum pump slowly apply enough vacuum to measure above -2” WC on the gauge. This vacuum signal opens the secondary valve in the N-2001 regulator/converter. 3. Release the vacuum pump lever and you will see the gauge needle start falling back toward zero. When the pressure drops just below the specified break-off pressure (-1.2 “ WC) of the secondary spring, the needle should stop moving. 4. At this point the secondary valve should close.
If the secondary valve seat or the secondary diaphragm is leaking the gauge needle will continue to fall toward zero (proportional to the leak size). An excessively rich air/fuel mixture can be caused by a secondary valve seat leak and the regulator should be replaced. Figure 30. Secondary Stage Test Connection WARNING – PROPER USE LP gas is highly flammable. To prevent perso- nal injury, keep fire and flammable materials away from the lift truck when work is done on the fuel system. Gas vapor may reduce oxygen available for breathing, cause headache, nausea, dizziness and unconsciousness and lead to injury or death.
Always operate the forklift in a well ventilated area Liquid propane may cause freezing of tissue or frostbite. Avoid direct contact with skin or tissue; always wear appropriate safety protection including gloves and safety glasses when working with liquid propane. N-2001 Regulator Service Testing For checking the N-2001 regulator/converter operation, the following tests can be performed. To check the secondary regulation (output) a simple vacuum hand pump can be used to simulate the vacuum signal transmitted from the air/fuel mixer when the engine is running. See listing below for required hardware. Break-Off Test Secondary Stage Test Hardware 1. Hand vacuum pump 2.
Regulator vapor outlet test fitting 3/4” NPT x 1/4” hose barb 3. Union Tee 1/4” NPT with three 1/4” NPT x 1/4” hose barb 4. Vacuum hose 5. 0-3” WC Magnehelic gauge (inches of water column) G643(E) Service Manual Chapter 6. LPG FUEL DELIVERY SYSTEM 214