MAINTENANCE ACCUMULATOR Check the gas pressure charge within the accumulator as follows: 1. Stop the machine on level ground and apply the parking brake. 2. Raise the work equipment to the maximum height, then place the lift arm control lever the HOLD position. 3. Leave the work equipment in this position, and stop the engine. 4. Confirm that it is safe around the machine, then set the lift arm control lever in FLOAT and lower the work equip- ment to a position of 1 m (1 yd) from the ground. 5. When the work equipment reaches a position 1 m (1 yd) from the ground, move the lift arm control lever to the LOWER position, and lower the work equipment slowly to the ground.
* If the work equipment stops moving during checking, the gas pressure may be below the service limit of 7 kg/cm* (100 psi I689 kPa). If so, contact your distributor to have the gas pressure measured and/or gas charged. * Carry out the checks within five minutes of stopping the engine. If the machine is left with the engine stopped, the accumulator pressure will drop and it will be impossible to carry out the check. COOLING SYSTEM COOLANT RECOMMENDATlONS/SPEClFlCATlONS For coolant recommendations/specifications, refer to “COOLANT’ under “LUBRICANTS, FUEL AND COOLANT”.
CHANGING COOLANT AND FLUSHING SYSTEM The coolant mixture must be drained and replaced at the specified service interval shown in the “SCHEDULED MAINTENANCE GUIDE’ or every two years of operation, whichever comes first. 1. Open the engine side access door on the left side of the machine. 2. Close the coolant filter shutoff valve (I), located on the left side of the engine. L12AM035 3-74