Komatsu — OPERATIONS AND CHECKECKS AFTER STARTING ENGINE

OPERATION OPERATION 5. Carry out bucket and arm operation for 5 minutes at full stroke, alternating between bucket operation and arm opera- tion at 30 second intervals. If the swing lock switch (6) is set to the ON (actuated) position and swing control lever (5) is operated at full stroke, oil tem- perature rise can be increased earlier. ~ @ Left swing 0 NOTICE When the work equipment is retracted, take care that it does not interfere with the machine body or ground. Right swing After carrying out the warming-up operation, check that each gauge and monitor lamp is in the following condition. Engine water temperature gauge (7): Inside green range I Fuel gauge (8):

Inside green range Engine water temperature monitor (9): OUT Radiator water level monitor (IO): OUT Engine oil pressure monitor (11): OUT Charge level monitor (12): OUT Fuel level monitor (13): OUT Air cleaner clogging monitor (14): OUT Engine pre-heating lamp (15): OUT Engine oil level monitor (16): OUT Hydraulic oil level monitor (1 7): OUT AD324290A Replacement monitor of engine oil (18): OUT Check that there is no abnormal exhaust gas colour, noise, or vibration. If any abnormality is found, repair it. Press mode switch (2) until required operation mode lamp is turned on.

HI0 GI0 FIO UO BIO 0 0 0 0 0 IN COLD AREAS (AUTOMATIC WARMING-UP OPERATION) When starting the engine in cold areas, carry out the automatic warming-up operation after starting the engine. AD157770A When the engine is started, if the engine water temperature is low (below 3OoC), the warming-up operation is carried out automati- cally. The automatic warming-up operation is cancelled if the engine water temperature reaches the specified temperature (3OoC) or if the warming-up operation is continued for 10 minutes. If the engine water temperature or hydraulic oil temperature are low after the automatic warming-up operation, warm the engine up further as follows. 106