Ripper Linkage (12 Points) 1. Lower all mounted equipment to the ground. 2. Apply grease until clean lubricant is visible. Always use a clean lubricator and wipe dirt from fittings before fresh grease is applied. If grease fails to go through the fitting, determine the cause and correct it. After greasing, wipe off any old grease that was purged. Blade Angle Frame to C Frame Pin (2 Points) 1. Lower all mounted equipment to the ground. 2. Apply grease until clean lubricant is visible. Always use a clean lubricator and wipe dirt from fittings before fresh grease is applied. If grease fails to go through the fitting, determine the cause and correct it.
After greasing, wipe off any old grease that was purged. 24.5 EVERY 100 HOURS 24.51 BLADE CUTTING EDGE HARDWARE Check the torque of the blade cutting edge hardware. u Plowboltnut . . . . . . . . . . . . . . . . . . . 455Nm(335Ibfft) 3-37