Komatsu PC8000AS — PC8000AS rev 02

Assembly Procedure PC8000 Z23014 PC8000AS rev 02.doc 148 Edition 01/2004 B – Checkfire SC-N Connection points Connection points Symbol Designation; location 9E1 Central unit SC-N; operators cab 9H1 Horn; above the door of the cab support 9S3 Detection wire; below the roof of the machinery house X1C Operators cab; dash board X2C X2 – board; cab support X2V X2 – board; cab support