Komatsu — 12.3.1 WHEN NORMAL

OPERATION 3. Set the safety lock lever to the FREE position, and raise the bucket from the ground. 4. Operate bucket control lever (4) and arm control lever (5) slowly to move the bucket cylinder and arm cylinder to the end of the stroke. 5. Carry out bucket and arm operation for 5 minutes at full stroke, alternating between bucket operation and arm operation at 30 second intervals. If the swing lock switch (6) is set to the ON (actuated) position and swing control lever (5) is operated at full stroke, oil temperature rise can be increased earlier. NOTICE When the work equipment is retracted, take care that it does not interfere with the machine body or ground. 6.

After carrying out the warm up operation, check that each gauge and monitor light is in the following condition as shown on the chart. 7 Engine Temperature Gauge 13 Fuel level monitor OUT Green Range 8 Fuel gauge 14 Air cleaner clogging monitor OUT Green Range 9 Engine coolant monitor OUT 15 Engine preheat light OUT 10 Radiator coolant level monitor OUT 16 Engine oil level monitor OUT 11 Engine oil pressure monitor OUT 17 Hydraulic oil level monitor OUT 12 Charge level monitor OUT 18 Replacement monitor of engine oil OUT 2-58