Komatsu — CHECK

MAINTENANCE PLAN 4.7.1.e CHECKING THE STEEL TRACK TENSION DANGER This operation must be carried out by two operators. One operator must be seated in the cab and oper- ate the machine according to the instructions of the operator who carries out the check and the adjust- ment. The shoe tension must be checked with the frame lifted from the ground; be careful not to move any control lever while the operator is carrying out the check. CHECK Check conditions: Firm and level ground. 1 - Rotate the upper structure by 90° on the side of the track to be checked. Work equipment resting on the ground. 2 - Fold the bucket, position the arm perpendicular to the ground and rest the bucket on the ground.

3 - Force with the boom until raising the track to be checked com- pletely. 4 - Measure the distance between the track rolling surface and the lower central rollers. Distance between roller and track: 20-25 mm. RWA06380 If the track tension value is not included in the prescribed interval, adjust the track by proceeding as follows. 20-25 mm RWA19720 150