. MAINTENANCE SERVICE PROCEDURE ADJUSTING TENSION OF CENTER BRACE (Power tilt dozer) (Powertilt, Power pitch dozer) (Semi-U dozer) WARNING side. At that time, adjust clearance 4 - 42 In c ase the work equipmen t assembly is disassemble d for transportatio n and r eassembled at a worksite, tension of the center brace has to be adjusted anew. Otherwise t he bushing at the connecting part of blad e and straight frame will likely slip off, allowing sand and dirt to enter the bu shing, w hich eventually leads to prema ture wear or damage of t he bushing. Make this Except when operating the bl ade in Step 4, always lock the blade control lever s ecurel y with the work eq 1.
Adjust with shim (2) so that the play of ball joint (1) is 0.2 to 0.7 mm (0.008 to 0.028 in ). ethod of adjusting, see "ADJUSTING RACE (PAGE 4-40)". bly. trol lever to float the blade. For details of the m SHIMS AT CENTER B 2. Loosen bolt (3). 3. Install the blade assem 4. Operate the blade con trol lever to float the blade. 5. Insert the bar in cente r brace hole (4) and turn t he bar t o the protruding between the track sho e and frame (A) so that it is equal o n the righ t and l Rotating torque: 24.5 t o 49 Nm (2.5 to 5 kgm, 18. 1 to 36. 2 lbft) (Blade at Standard distance bet ween the joints (B) is as sh own below. D65E: 995mm (39.2 in D65P: 992mm (39.1 in 6. Tighten bolt (3).
Tightening torque: 490 .3 to 608 Nm (50 to 62 kgm , 361.7 to 448.4 l bft