. ATTACHMENTS, OPTIONS HANDLING HYDRAULIC RIPPER ATTACHMENTS, OPTIONS HANDLING HYDRAULIC RIPPER shank hole, then 6 - 6 When c hanging the digging depth, do as f ollows. 1. Remove cot ter pin (1). 2. Remove pin insert pin (2) 3. Insert cotter ADJUSTING DIGGING ANGL Adjust t he positi on of the mounting pin hole in the bea m and upper link. Digging angle Position (1): 4 Position (2): 5 The pin is locke d with lock p late (3). REPLACEMENT OF POINT A point is installe d to protect the shank . If th e poin t is w orn, replace it as follows. 1. 2. 3. 1. Put a pin re mover in contact with t he p in marked b y the arrow and tap with a hammer to remove. 2. Replace the 3.
Insert the pi n half way, t hen knock it in fully with a hammer.