International Trucks — International VT 365 Diesel Engine Service Manual 2004-2006

MANIFOLDS AND EXHAUST GAS RECIRCULATION (EGR) 93 5. Apply anti-seize compound to the threads of the EBP sensor tube fitting. 6. Install EBP sensor tube to exhaust manifold and tighten fitting to the special torque (Table 8). Figure 127 Mounting bolts for shielded tube exhaust assembly on left exhaust manifold 9. Apply anti-seize compound to two M8 x 60 bolts securing the shielded tube exhaust assembly to the exhaust manifold flange. Loosely assemble bolts and nuts. Figure 126 Exhaust tube bolts (upper right) 10. For VGT installation procedure, see (Installation, page 67). 11. After VGT installation, torque all bolts for VGT tubing in the following order: 7.

Apply anti-seize compound to the threads of two M8 x 30 bolts and prevailing torque nuts. a. Shielded exhaust tube assembly at right exhaust tube (upper flange) 8. Install a new exhaust tube gasket and secure the shielded tube exhaust assembly (upper right side) to the right exhaust tube assembly. Loosely assemble bolts and nuts. b. Turbocharger exhaust adapter V-clamp c. EGR cooler V-clamp d. Shielded exhaust tube assembly at left manifold e. Exhaust tube assembly at right manifold See (Table 8) for special torque specifications. EGES295-2 Read all safety instructions in the "Safety Information" section of this manual before doing any procedures. Follow all warnings, cautions, and notes.

©2006 International Truck and Engine Corporation