DRESSTA Co. Ltd. TD-40C98/1E — 5.20. ADJUSTING HAND AND FOOT CONTROLS

SECTION 5 MAINTENANCE Page 62 5.19. UNDERCARRIAGE Lubricate equalizer bar pivot pin every 500 hours of operation or earlier if necessary. Lubrication line fitting is remotely located in upper part of front mainframe as shown in the drawing. Periodically check the condition of wear pads that support equalizer bar ends in track frame rebound brackets. Replace pads if any cracks are found. 5.19.8. FRONT WHEEL Check the thickness of front wheel guides. If they are weared (min. thickness is 27 mm) cut off them and weld new. 5.20. ADJUSTING HAND AND FOOT CONTROLS Check engine high and deceleration RPM. If RPM values are incorrect proceed as follows:

Check adjustment of hand levers and foot pedals per below given drawing. a) Adjust lever “4” to vertical position of the lever for high idle speed (2305 RPM) During the adjustment the lever “1” must be placed in its foremost position. b) Adjust lever “2” to maintain the dimension 202 mm and 9 mm. c) Adjust foot pedal “3” to maintain the dimensions in mm (Refer to Fig. 5.57):

I - Engine high speed position (2305 RPM) II - End of deceleration (1200 ± 100 RPM) III - Beginning of braking IV - Full brake After adjustment made lubricate linkage and fill bearings with grease thru lubrication fittings (refer to “LUBRCATION FITTINGS”) and check if the machine is stopped with applied Decelerator– Brake pedal (refer to 3.3. for brake operation principle). Perform brake test as follows: - start the engine and bring transmission system to operating temperature - shift to 2nd speed with engine at top speed and brake the machine for a while With correct adjustment made the machine should stop. If in doubt contact Authorized Distributor of Construction Equipment.

Periodically lubricate plate-to-plunger contact area of blade and ripper pilot valves. TD-40C DRESSTA