. OPERATION MACHINE OPERATIONS AND CONTROLS OPERATION MACHINE OPERATIONS AND CONTROLS NOTICE (E): Left swing (F): Right swing 3 - 100 3. (3) and ontr ever (4) slowly to mo ve the bucke t cylinder and arm cylinde r to the end of the strok 4. Operate the bucket for 30 seconds and the arm for 30 seconds in turn fully for 5 minutes. (A): Arm is (B): Arm is (C): Bucket is pushed ou (D): Bucket When the work eq uipment is retracted, tak e care that it does not interfere with the machine body or groun 5. If swing lock switch (6) is set to the ON (actuated) p osition and swing contr ol lever (5) is o perated a t full stroke, oil t emperature rise can be increased earlier