. MAINTENANCE MAINTENANCE PROCEDURE CHECK NITROGEN GAS CHARGE PRESSURE IN ACCUMULATOR (control circuit) shown in the 4 - 41 NOTICE If the nitrogen gas charg e pressure in the accumulator is low a nd operations ar e continued, it will become impossible to release the r emaining pressure i nside the hydraulic circuit if a fa ilure o ccurs on the machine. Check the n itrogen ga s charge pressure as f ollow 1. Se t t he wor k equ ipment to diagram on the rig 2. Stop the engine a nd carry out th e LOWE R operation for th e boom. 3.
Check t hat the tip of the bucket d rops at l east 1 m (3 If the tip of t he bu cket drop s less than 1 m (3 ft ), the charg e pressure inside the accumulator is low, so c ontact your Komatsu dis tributor