UPPERSTRUCTURE / Pilot Shut-Off Solenoid Valve Installation 1. Install pilot shut-off solenoid valve (9) to plate (6) with bolts (10) (2 used) and washers (11) (2 used). Footrest Travel Pilot Valve : 17 mm : 50 N m (5 kgf m, 36 lbf ft) 2. Install hoses (5) (9 used) to pilot shut-off solenoid valve (9). 6 W1JB-02-08-004 10, 11 5 6 7 : 17 mm : 24.5 N m (2.5 kgf m, 18 lbf ft) : 19 mm : 29.5 N m (3 kgf m, 22 lbf ft) 3. Install connector (8). 4. Install bolt (7). : 50 N m (5 kgf m, 66 lbf ft) 5. Install cover (2) onto main frame (1) with bolts (3) (9 used) and washers (4) (9 used). : 17 mm 5 8 W1JB-02-08-003 5 9 1 2 : 90 N m (9 kgf m, 66 lbf ft) : 19 mm 3, 4 W1JB-02-11-002 W2-8-2