hitachi — REMOVE AND INSTALL SIGNAL CONTROL VALVE

UPPERSTRUCTURE / Signal Control Valve Installation 1. Install signal control valve (5) to bracket (6) with socket bolts (7) (4 used). 5 : 8 mm : 50 N m (5 kgf m, 36 lbf ft) 2. Install all hoses and the connectors (2 used) to signal control valve (5). 6 W1JB-02-10-001 4-Spool Solenoid Valve 7 : 17 mm : 24.5 N m (2.5 kgf m, 18 lbf ft) : 19 mm 5 : 29.5 N m (3 kgf m, 22 lbf ft) 3. Install covers (2, 4) onto main frame (1) with bolts (3) (11 used). W1JB-02-09-004 3 2 : 90 N m (9 kgf m, 66 lbf ft) : 19 mm 4 3 1 1 W1JB-02-05-001 W2-10-2