hitachi — REMOVE AND INSTALL ENGINE

UPPERSTRUCTURE / Engine 15. Remove pre-cleaners (43) (2 used) and covers (44, 45, 46). (Refer to the Remove and Install Pump Device group on W2-4-1.) 37, 38 44 43 39 45 CAUTION: Cover (42) weight: 25 kg (55 lb) 16. Attach a nylon sling onto cover (42). Hoist and hold cover (42). Remove sems bolts (41) (8 used) from cover (42). Remove cover (42) from supports (47, 49). 37, 38 36 46 W1JB-02-14-001 39, 40 : 19 mm 17. Remove sems bolts (39) (8 used) and washers (40) (8 used) from covers (36) (2 used). Remove covers (36) (2 used) from support (47). 37, 38 : 19 mm 18. Remove bolts (37) (4 used) and washers (38) (4 used) from duct (39). Remove duct (39) from support (47). :

19 mm W1JB-02-12-007 36 39, 40 47 47 49 CAUTION: Beam (35) weight: 22 kg (49 lb) 19. Attach a nylon sling to beam (35). Hoist and hold beam (35). Remove sems bolts (48) (6 used) from beam (35). Remove beam (35) from supports (47, 49). 48 47 W1JB-02-14-002 35 CAUTION: Support (47) weight: 34 kg (75 lb) 20. Attach a nylon sling to support (47). Hoist and hold support (47). Remove sems bolts (52) (4 used) from support (47). Remove support (47) from supports (50, 51). : 19 mm W1JB-02-14-002 W2-14-4 36 39, 40 41 42 39 39, 40 36 47 50 52 51 47 50