hitachi — REMOVE AND INSTALL ENGINE

UPPERSTRUCTURE / Engine CAUTION: Support (49) weight: 21 kg (46 lb) 21. Attach a nylon sling to support (49). Hoist and hold support (49). Remove sems bolts (59) (4 used) from support (49). Remove support (49) from supports (53, 58). 54 49 53 55 56 : 19 mm 22. Remove support (54), stay (55) and covers (56, 57). (Refer to the Remove and Install Pump Device group on W2-4-1.) W1JB-02-14-002 57 58 59 CAUTION: The muffler (60) assembly weight: 73 kg (160 lb) 23. Remove nuts (67) (8 used) from bolts (62) (4 used). : 17 mm 24. Attach a nylon sling to the muffler (60) assembly. Hoist and hold the muffler (60) assembly. Remove sems bolts (64) (4 used) from bracket (63).

Remove the muffler (60) assembly from bracket (65) and pipe (66). : 19 mm W1JB-02-14-003 CAUTION: Release any pressure in the hydraulic oil tank before doing any work. (Refer to BLEED AIR FROM HYDRAULIC OIL TANK on W1-4-1.) 25. Remove air cleaners (61) (2 used), hose and connector in the pump device. (Refer to the Remove and Install Pump Device group on W2-4-1.) 60 62 63 64 66 65 67 Detail for Position C W1JB-02-14-022 W2-14-5 C 60 61