UNDERCARRIAGE / Center Joint REMOVE AND INSTALL CENTER JOINT IMPORTANT: Release any pressure in the hydrau- lic oil tank before doing any work. (Refer to “Bleed Air from Hydraulic Oil Tank” on page W1-4-1.) Removal Machine Front IMPORTANT: Attach an identification tag to all the hoses of center joint for reassem- bling. IMPORTANT: Remove all the hoses and adapters from center joint. Attach a cap to the removed hoses. 1. Remove hoses (1, 2, 5, 6) and adapters (4 used) from the upper side of spindle on the center joint. 7 8 1 2 6 W16J-03-03-002 5 3 : 41 mm 4 Spindle 2. Remove hoses (3, 4) from the spindle. : 27 mm, 19 mm 3. Remove bolts (8) (2 used) and spring washers (2 used).
Remove stopper (7) from the spindle. At this time, remove the washers (2 used) between stopper (7) and spindle. : 22 mm CAUTION: Center joint weight: 52 kg (110 lb) 4. Install eyebolts (G1) to the adapter holes (2 places) in diagonal position on the upper side of spindle. Attach a nylon sling onto eyebolt. Take up slack of the nylon sling. Center Joint 9 17 16 10 5. Remove hoses (9 to 16) from lower side of center joint. Track Frame : 22 mm, 27 mm, 41 mm 15 6. Put the matching marks on track frame and cen- ter joint. Remove bolts (17) (4 used) and spring washers (4 used). Remove the center joint slowly. 14 11 W16J-03-03-003 12 13 : 24 mm Machine Front W3-3-1