hitachi — REMOVE AND INSTALL BUCKET

FRONT ATTACHMENT / Front Attachment Installation CAUTION: Bucket weight: 2.9 m 3 bucket: 2980 kg (6570 lb) 3.5 m 3 Bucket (BE): 3790 kg (8355 lb) 1. Hoist the bucket and lower the bucket bottom onto the ground. 2. Start the engine. Extend the bucket cylinder. Travel the machine forward and align the pin (6) hole on bucket with that on arm. Stop the engine. 3. Insert the shim between arm end and bucket. Ad- just the clearance between arm end and bucket to 0.5 to 1.0 mm (0.02 to 0.04 in). Arm Bucket Cylinder Hole for Pin (3) W1J7-04-01-009 CAUTION: Metal fragments may fly off when a hammer is used. Wear necessary protection, such as goggles, hard hats, etc in order to prevent personal injury.

CAUTION: Pin (6) weight 2.9 m 3 bucket: 94 kg (207 lb) 3.5 m 3 Bucket (BE): 98 kg (216 lb) 4. Attach a nylon sling onto the body of pin (6) and hoist pin (6). Install pin (6). Install stopper (7) to pin (6) with bolts (8) (3 used). M1JB-07-057 Shim Arm : 30 mm Arm : 400 N m (40 kgf m, 295 lbf ft) 5. Extend the bucket cylinder. Align the pin (3) hole on bucket with that on link A. Bucket W1J7-04-01-022 Bucket W1J7-04-01-021 W4-1-4 ole for in (6) Bucket 6 0.5 to 1.0 mm (0.02 to 0.04 in) et 7 8 Arm 6