FRONT ATTACHMENT / Front Attachment NOTE: Procedures 4, 5 are for the machine equipped with the auto lubrication device (optional). 4. Install lubrication hose (7). : 22 mm 7 : 40 N m (4.0 kgf m, 30 lbf ft) 5. Install clip (9) to lubrication hose (7) and secure with bolt (8). 8 : 17 mm : 50 N m (5.0 kgf m, 37 lbf ft) 6. When adding hydraulic oil to the specified level, start the engine and check for any oil leaks at hose connection. 9 CAUTION: Boom cylinder weight: 850 kg (1875 lb) 7. Hoist the boom cylinder rod side. Start the engine. Extend the boom cylinder and align with the pin (2) hole. W1J7-04-01-001 Boom Cylinder 2 CAUTION: Metal fragments may fly off when a hammer is used.
Wear necessary protection, such as goggles, hard hats, etc in order to prevent personal injury. CAUTION: Pin (2) weight: 37 kg (82 Ib) 8. Attach a nylon sling onto pin (2) and hoist pin (2). Insert plate (6) between boom and boom cylinder. Install pin (2). Install the boom cylinder to the boom. 9. Secure pin (2) to the boom with plate (5), spring washers (3) (2 used) and bolts (4) (2 used). W1J7-04-01-016 5 Boom 4 : 30 mm 3 : 400 N m (40 kgf m, 295 lbf ft) 2 Boom Cylinder W1JB-04-02-008 W4-1-16 6