Doosan D80S-5 — Doosan D80S-5 User Manual

Maintenance Section LP Regulator/Converter Inspection (LP Engine Only) NOTICE z Visually inspect the pressure regulator/converter housing(2) for coolant leaks. Refer to the pressure regulator/converter section of the service manual if maintenance is required. Always replace the secondary element. Do not attempt to reuse it by cleaning. 3. Install a new secondary element. Install a new or cleaned primary element. Install the cover. Tighten the latches. NOTE: For pressure testing and internal inspection of the pressure regulator/converter, refer to the pressure regulator/converter section of the service manual. Fuel Lines & Fittings – Check 4.

Start the engine and observe the air cleaner service indicator. If the indicator shows RED after installing a new secondary element and a cleaned primary (outer) element, replace the cleaned primary filter with a new element. 5. Stop the engine. Close the hood and seat assembly. Inspect Coolant Hoses (LP Engines Only) Visually inspect fuel lines and fittings for physical damage. Replace as required. Inspect Mixer Assembly (LP Engine Only) Refer to the LP mixer section of the engine service manual for procedures. z Visually inspect coolant hoses and clamps. Remember to check the two coolant lines that connect to the pressure regulator/converter.

z Replace any hose that shows signs of swelling, cracking, abrasion or deterioration. Inspect Throttle Assembly (LP Engine Only) 1 6 z Visually inspect the throttle assembly motor housing for coking, cracks and missing cover-retaining clips. Repair and/or replace as necessary. 4 NOTE: Refer to the LP mixer and throttle section of the service manual for procedures on removing the mixer and inspecting the throttle plate. 7 3 2 5 (1) LP fuel lock-off, (2) LP regulator/converter (3) Fuel Trim Valve(FTV), (4) LP mixer (5) Vacuum lines, (6) Coolant lines, (7) LP fuel line 173