. OPERATION OPERATION WARNING NOTICE 3 - 143 LOADING OPERATION Select the m ethod of opera tion which w ill give the min imum amoun t of turn ing and travel in order to provide the most efficient me thod for the job Always ke ep the jobsite fla t, and do not operate t he stee ring wheel suddenly or apply the brakes suddenly when the lift arm is raised wit h a loaded bucke t. This is dan gerous. Never thru st the bucket in when travelin g at high speed (when loading soil or crushed rock). This is dang When the machine is trave ling or the w ork equipment i s raised, th e moment t hat the E.C.S.S. switch is tu rned ON, the work equipmen t will move.
If operatio ns are carried ou t with the E.C .S.S. switch left at the ON p osition, the moment that the travel dam per is actuated, the work equi pment will move If the tires slip, the tire life will be reduce d, so do not all ow the tire s to slip dur Avoid exc essive bucket sh CROSS DRIVE LOADING Always set t he wheel load er facing at a right angle to the stockpile. After diggin g in and sco oping up th e load, drive the m achine straight bac k in reverse, th en bring the dump t ruck in between the stock pile a nd the wheel lo ader. least time for loading, and is extremely ycle time. This metho d requires the effective in reducing the c