Komatsu — OPERATIONS AND CHECKS AFTER STARTING ENGINE

OPERATION OPERATION 3. If swing lock switch (3) is turned ON and swing control lever (4) is operated fully, the oil temperature will rise more quickly. 4. After warm-up run is completed, check gauges in the fol- lowing condition. If any abnormality is found, repair it. Engine water temperature gauge (5). Inside green range Fuel gauge (6). Inside green range Engine oil pressure monitor (7). OUT Charge level monitor (8). OUT 5. Check that there is no abnormal exhaust gas color, noise, or vibration. If any abnormality is found, repair it. 6. Set safety lock lever (2) to the LOCK position.

Then oper- ate swing control lever and dump body control pedal and check that the upper structure does not swing and that the dump body cannot be raised or lowered. 3-52