. MAINTENANCE MAINTENANCE PROCEDURE LUBRICATING (4) Arm cylinder foot pin (1 place) 4 - 45 EVERY 500 HOURS MAINTENANC Maintenan ce for ev ery 100 and 250 hours s hould be carried out a t the s NOTICE During t he initial 50 hours break ing-in period for a new machine, carry out lub rication every 10 hours. I f diggin g operation s have been carried out in water (su ch as digging h oles), always carry out greasing for the pins that were nder w F or heav y-duty ope rations, such as hydraulic breaker w ork, c arry out l ubricat T he lubr ication inte rval needs to be shortened dependi ng on the kind of work 1.
Set th e machin e to the gre asing postur e shown on t he right, lower the work e quipment t o the ground , then sto p the engine. 2. Using a grease pump, pu mp in grease through the grease old grease that was pushed out. fittings shown b y arrows. 3. After g reasing, wipe off any old grease that was pushed (1) Boom cylinder fo ot pin (2 pl (2) Boom foot pin (2 places) (3) Boom cylinder ro d end pin (