Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 05 ELECTRICAL SYSTEM Subsection 03 (IGNITION SYSTEM) smr2009-030-015_h If test succeeded, wiring and connectors are func- tional. If test failed, repair/replace wiring from fuse box terminal to ignition coil. Reinstall bus bar and cover. smr2007-023-003_d IGNITION COIL CONTROL CIRCUIT TEST If test failed, repair the connector or replace the engine wiring harness. If test succeeded, wiring and connectors are func- tional. Ignition Coil Control Circuit Test Disconnect ECM connector "A". Refer to ELEC- TRONIC FUEL INJECTION. Install ECM connector on the ECM ADAPTER TOOL (P/N 529 036 166) .

Ignition Coil Resistance Test An ignition coil with a good resistance measure- ment can still be faulty. Current leakage can occur at high voltage levels which is not detectable with an ohmmeter. Replacing the ignition coil may be necessary as a test. Remove ignition coil. Refer to IGNITION COIL RE- MOVAL below. Perform a visual inspection of ignition coil for cor- rosion. Using a multimeter, test the resistance in both pri- mary and secondary windings. 529036166 Disconnect ignition coil connector. Test for continuity of circuit as per following table.

smr05-015-002_a PRIMARY WINDING 292 smr2009-032 COIL IGNITION COIL WIRE ECM ADAPTER RESISTANCE Cylinder 1 (rear) BR/BK A-M4 Close to 0 (continuity) Cylinder 2 BR/OR A-M2 Cylinder 3 BR/YL A-M1 CIRCUIT TERMINAL RESISTANCE @ 20°C (68°F) Primary winding 1 and 2 0.85 - 1.15