Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 05 ELECTRICAL SYSTEM Subsection 07 (GAUGE) If the MODE switch is pressed, 2 diodes are by- passed. The remaining two diodes in the circuit drop 1.2 Vdc (at pin B). If the SET switch is pressed, 1 diode is bypassed. The remaining three diodes in the circuit drop 1.8 Vdc (at pin B). The gauge senses these voltages through pin 17 of the gauge connector, and interprets them as signals that tell it which switch is activated. The same is true for the UP/DOWN arrow switches, iS switches and VTS switches on their respective circuits.

If the command generated by the closure of a switch concerns another module, a circuit within the gauge will translate it to CAN protocol and transmit it through the CAN bus. The applicable module will react to the command, carry out the function, and transmit the result back through the CAN bus. The information center will use the signals from the switches and the transmitted information from the other modules, convert them to an in- dication, and cancel the command signal it sent out once the function has been carried out. Command signals from the MODE and SET switches are used by the information center only. VTS and iS switch commands are translate and sent to the modules.

The UP/DOWN arrow switch commands are used by the gauge for cer- tain functions and settings only. The UP/DOWN button command signals will also be translated and sent out through the CAN bus to be used by the ECM for the CRUISE and SLOW SPEED func- tions (increasing or decreasing speed when the functions are active), and by the iBR for iBR gate positioning in SLOW SPEED mode of operation. NOTE: The above stated voltages vary slightly de- pending on the actual voltage applied to the circuit and the current flow through the diodes. When using a Fluke 115 multimeter for testing in diode test mode, the voltage and current applied by the multimeter are lower than in circuit.

The quality of probe contact, the actual probes and leads, and the precision of the meter calibration will all affect the results, which will most likely be slightly lower than nominal values stated. 2. Press the START/STOP button to energize the electrical system. NOTE: You will need to press the START button every three minutes or the electrical system will shut off. 3. Select the Read Data button. 4. Choose the Monitoring tab at the top of the page. 5. At the bottom LH side of the monitoring page, select the Cluster tab. smr2009-036-002_a 1. Read Data button 2. Monitoring tab 3. Cluster tab 4. Switch inputs field 6.

Press each of the MODE/SET and UP/DOWN arrow buttons and look for the applicable indica- tor light to come on in the Switch inputs field on lower RH side of the cluster page (Mode , Set , UP or Down). smr2009-036-012_a SWITCH INPUTS 1. MODE/SET and UP/DOWN arrow button indicator lights MODE/SET and UP/DOWN Arrow Buttons Test Using B.U.D.S. 1. Connect the watercraft to the latest B.U.D.S. software. Refer to COMMUNICATION TOOLS AND B.U.D.S. SOFTWARE. If each of the gauge button indicator lights come on when the applicable switch is pressed, the problem may be related to the information center. 352 smr2009-036