Section 06 STEERING AND PROPULSION Subsection 04 (DRIVE SHAFT) 23. Run watercraft then ensure there is no oil leak in PTO seal area. 24. Properly reinstall the deck extension, moving deck and ventilation box. Refer to BODY sub- section. SEALING RING Sealing Ring Removal 1. Remove drive shaft. Refer to DRIVE SHAFT in this subsection. 2. Carefully pry out sealing ring from PTO seal working alternately from side to side while retaining PTO seal. smr2009-007-005_a 1. Tapered surfaces Sealing Ring Installation 1. Carefully insert sealing ring in the PTO seal. 2. Ensure sealing ring is completely inserted in the PTO seal. NOTE: The sealing ring flange must be flush with the PTO seal flange.
smr2009-007-007_a Sealing Ring Inspection Inspect condition of threads, tapered surfaces, carbon seal contact surface and seal lip contact surface. If damage is found, replace sealing ring. Sealing Ring Cleaning Clean the following sealing ring surfaces and threads. smr2009-007-009_a CORRECT 1. Sealing ring fully inserted into PTO seal smr2009-007-004_a 1. Seal lip contact surface 2. Threads (inside) 3. Carbon seal contact surface smr2009-040 435