Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 07 BODY AND HULL Subsection 02 (BODY) 9. Install the front trim. 9.1 Insert top tabs and align lower tabs with openings. ssi2009-003-102_a 1. Locking lever 2. Boarding platform slot 4. Position a double cage nut on the locking mech- anism. ssi2009-003-016_a 1. Tabs 9.2 Press trim in place. 10. Test Speed-Tie operation. 11. Reinstall all removed parts. Rear Speed-Tie Unit Installation 1. Lift up the boarding platform. 2. To facilitate the locking mechanism insertion, temporarily pull approximately 200 mm (8 in) of rope. ssi2009-003-103_a 1. Double cage nut 5. Secure it using two M6 x 45 tapered screws. ssi2009-003-104_a 1. M6 x 45 tapered screws ssi2009-003-101_a 1.

Locking mechanism A. 200 mm (8 in) 6. Install the second double cage nut. 7. Secure the reel of the Speed-Tie unit on board- ing platform using four hexagonal plastite screws #10 x 7/8". 8. Tighten screws to 5 N•m ± 1 N•m (44 lbf• in ± 9 lbf• in ). 3. Insert the locking mechanism in boarding plat- form opening. Position the locking lever toward the slot. 488 smr2009-042