Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 07 BODY AND HULL Subsection 03 (HULL) The bailer pick ups are connected through a hose system to two syphon tubes mounted in the jet pump venturi that draw the water out of the bilge through the bailer pick ups. The bailers are also connected to the bilge drain plugs in the stern. Bailer Pick-Up Inspection 1. Open boarding platform and remove the stor- age bins. 2. Inside hull, check holes in the bailer pick-ups to see if they are obstructed. Clean if necessary. NOTE: On the port side (LH), the bailer is located below the iBR actuator. smr2009-043-023_a TYPICAL 1. Fitting properly seated, excess sealant removed SPONSON NOTE:

Removal and installation procedure for RH and LH sponson is the same. Sponson Removal Unscrew sponson retaining screws, then remove sponson. smr2009-043-006_c TYPICAL - LEFT SIDE SHOWN (IBR ACTUATOR REMOVED) 1. Bailer assembly NOTE: On the starboard side (RH), the bailer is located between the battery support base and the hull (jet pump tunnel). smr2005-024-014_a TYPICAL 1. Sponson 2. Bolts Sponson Installation 1. Install the spacers in the holes provided in the sponson on the hull side of the sponson. See exploded view. 2. Thread a screw with washer through each hole and install sponson on watercraft. Torque spon- son retaining screws as specified in exploded view. smr2009-043-035_a 1.

Starboard bailer BAILER SYSTEM 3. Check if the hole on each bailer hose elbow fit- ting is obstructed. Clean both elbow fittings if necessary. Two bailer pick ups (one each side), serve to drain the bilge of the watercraft when it is in operation. 506 smr2009-042