Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 02 ENGINE Subsection 05 (INTERCOOLER) smr2009-019-005_a FIXED DECK REMOVED FOR CLARITY PURPOSE 1. iS module 2. Retaining latch smr2009-019-003_a 1. Intercooler air inlet hose 2. Intercooler air outlet hose Cut locking ties securing wiring harness to iS mod- ule support and front attachment. Detach both intercooler straps. smr2009-019-006_a 1. Cut these locking ties smr2009-019-004_a 1. Intercooler straps Remove the iBR actuator. Refer to iBR AND VTS subsection. Remove the intercooler from vehicle by the LH opening. Remove screws securing the front attachment to the hull. Intercooler Installation The installation is the reverse of the removal pro- cedure. NOTE:

Ensure hoses are routed correctly and locking ties are positioned at proper locations. INTERCOOLER ATTACHMENTS smr2009-019-007_a 1. Retaining screws Front Attachment Replacement NOTE: Front attachment and iS module support are attached together with rivets. Remove the INTERCOOLER, see procedure in this subsection. Detach iS module from its support and move the module aside to make room. Remove front attachment and iS module from ve- hicle. When reinstalling, tighten screws to 8 N•m (71 lbf• in ). Install all other removed parts. Rear Attachment Replacement Remove the INTERCOOLER, see procedure in this subsection. 56 smr2009-019